A-01 · Front elevation · Drawn to scale
Every boundary,built to themillimetre.
Fencing, retaining walls and balustrading for homes, shared boundaries and school sites. Choose a material and see it standing at true height before anyone talks price.
Indicative pricing at sample rates for this concept. Every job is confirmed by a fixed quote after a site measure.
A-02 · Recent work
Lines worth living beside.
Hardwood screens, steel boundaries, glass around the pool and bluestone at the street. Each one set out with string lines and finished to the posts.
Swipe for more projects. These are example projects drawn for the concept. The client's own photography replaces them on the finished site.
A-04 · Specification
Three trades, one crew.
The same team sets out the fence, cuts in the retaining wall and stands the glass. One programme, one point of contact.
Fencing
Colorbond steel, hardwood and pine slat, frameless glass and bluestone plinth fences for backyards, front boundaries and pools.
- Heights
- 1200 to 2100 mm
- Post centres
- 2400 mm typical
- Footings
- Concrete, 600 mm min.
- Pool barriers
- 1200 mm min., self-latching gates
Retaining walls
Concrete sleeper, bluestone block and treated pine walls that hold the ground and shed water properly.
- Systems
- Sleeper, block, timber
- Drainage
- Ag pipe and gravel, every wall
- Steel posts
- Galvanised H and C sections
- Engineering
- Arranged when required
Balustrading
Frameless glass and stainless wire balustrades for decks, stairs, balconies and pool terraces.
- Glass
- Toughened or laminated
- Fixings
- 316 stainless spigots
- Handrails
- Stainless or timber
- Compliance
- National Construction Code
A-05 · Programme
How a job runs.
Five steps, in this order, every time. You always know which one you are on.
- Step 1
Request
Send photos and rough measurements, plus your neighbour's details if the fence is shared.
- Step 2
Site measure
We confirm lengths, levels, access, services in the ground and the true boundary line.
- Step 3
Fixed quote
One quote per owner, with GST and the split written out line by line.
- Step 4
Build
Booked to suit you, or to the school calendar. Site left clean each day.
- Step 5
Sign-off
A walk-through together. Pool barriers handed over ready for inspection.
A-06 · Education sites
Built around the school calendar.
Facilities managers get the paperwork before the first visit, and the noisy work happens while the students are away.
A-07 · Quote request
Get it priced.
Three short steps. We reply within [REPLY TIME] to book a site measure.